The Engineering Department coordinates, reviews, and approves all private-funded public improvements initiated by the development community, from design through construction to completion. The Engineering Team works closely with the Planning and Building Teams to accomplish this task.

In addition, the Engineering Team reviews and manages many of the City's capital improvement projects. The Department's Public Improvements Inspector inspects all water line installation and work that occurs within the public right-of-way.

 

Park City Supplemental Standards and Specifications

The City has adopted the American Public Works Association (APWA) Standard Specifications and Plans as the standards for all construction and improvements in the public right-of-way. The Engineering Team additionally maintains and updat the City Supplemental Standards and Specifications to be used in conjunction with the APWA standards.

Park City 2025 Supplemental Standards and Specifications

Traffic Impact Study Guidelines

The Traffic Impact Study Guidelines provide a framework for when a transportation impact study may be required for new land use developments or redevelopments in Park City. The required contents of the transportation impact study are also provided in these guidelines. 

Traffic Impact Study Guidelines

TO REPORT SIDEWALK, CURB & GUTTER, DRAINAGE AND/OR CONSTRUCTION ISSUES PLEASE CONTACT THE PUBLIC IMPROVEMENTS INSPECTOR, 435-615-5071. IF AFTER HOURS OR AN EMERGENCY PLEASE CONTACT POLICE DISPATCH AT 435-615-5500.

THANK YOU FOR YOUR TIME AND EFFORT IN KEEPING PARK CITY BEAUTIFUL AND SAFE.

List of Private and Public Roads

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

Current Engineering RFP's

RSOQ: Senior Center Design Services

  • Department:BPE - Building / Planning / Engineering, Economic Development
  • Category:Current RFP's and Bids
  • RFP Number:PCMC25181 - ECO
  • Start Date:05/27/2025
  • Close Date:06/20/2025 2:00 PM

RSOQ: Senior Center Design Services

View and submit RFP here

PCMC is inviting Statements of Qualifications (SOQs) proposals from qualified persons or firms (“Respondent”) to provide Senior Center Design Services.

PROPOSALS DUE: By 2:00 P.M. MST on Friday, June 20, 2025. Submit proposals electronically via Bonfire formerly Utah Public Procurement Place (“U3P”). The proposals will be opened after the submission deadline.

RSOQ AVAILABLE: The RSOQ will be available on May 27, 2025, on the U3P website. Any modifications to the RSOQ or responses to questions submitted will be added as an addendum to the RSOQ posted on the U3P website. It is the responsibility of Respondents to regularly check for addenda.

QUESTIONS: All questions regarding this RSOQ must be submitted in writing through the U3P website by 5:00 p.m. MST on Monday, June 16, 2025. Please do not submit the same question multiple times.

PROJECT LOCATION: 1220 Park Avenue, Park City, UT 84060

PROJECT DESCRIPTION: Provide design services for the construction of a proposed Senior Center: new two (2)-story building of approximately 10,000 square feet with a footprint of approximately 7,000 square feet that will be located at the current site of the Mawhinney Parking Lot in Park City, UT.

PROJECT DEADLINE:

  • Phase 1 (Site Assessment and Concept Design Review): anticipated duration of 4 months from July 2025 to November 2025.
  • Phase 2 (Schematic Design): Anticipated duration of 6 months from December 2025 to June 2026.
  • Phase 3 (90 and 100% Construction and Bid Documents): Anticipated duration of 6 months from July 2026 to January 2027.

OWNER:
Park City Municipal Corporation
P.O. Box 1480
Park City, UT 84060

CONTACT: Grant Herdrich, JD, Procurement Manager, grant.herdrich@parkcity.org

Proposals will remain valid for 90 days after submission. PCMC reserves the right to reject any or all proposals received for any reason. Furthermore, PCMC reserves the right to change dates or deadlines related to this RSOQ. PCMC also reserves the right to waive any informality or technicality in proposals received when in the best interest of PCMC.

Return to full list >>

Interested in receiving or changing Park City notifications?


eNotification Signup | Change eNotification Preferences
Please correct the fields below:
To change your eNotification preferences, please submit your email address. You will be sent a link to change and confirm your preferences.